Tie down, Jt25 operator’s manual – Ditch Witch JT25 User Manual
Page 82
Advertising
JT25 Operator’s Manual
Transport - 81
Load
CMW
Tie Down
Points
Tiedown points are identified by tiedown decals. Securing to trailer at other
points can damage machinery.
Procedure
Loop a transport chain around each tie down point. See chart below for correct distances between tiedown
ends. Make sure tiedowns are tight before transporting.
NOTICE:
•
Wrenches can open after engine shutdown. Ensure that any downhole tool or pipe in wrenches is
attached to spindle or removed before transport.
•
Use Grade 7-3/8” (18.7 cm) transport chain to secure drilling unit.
Distance
U.S.
Metric
A
12-45” 31-114
cm
B
12-45” 31-114
cm
C
less than 55”
less than 140 cm