Replacing the fuse – Labconco VACUUBRAND Diaphragm Pump 7393000 User Manual

Page 66

Advertising
background image

page 66 of 74

1

2

2

Important: Check operability and safety of the pump

after repair and after replacing the device fuse.

Check the electrical safety (protective conductor resis-

tance, insulating resistance, high voltage test) according

to IEC 61010 and national regulations.

Replacing the fuse

Order-no. Set of fuses NT............................636542

The pigtail fuses are integrated into wires ((1),

black and blue) inside the terminal box.

To replace the fuses it is necessary to replace

both wires completely (fixed with flat pin bush-

ings (2)).

Open the terminal box. Unscrew the four screws with a Torx driver

T20. Remove the terminal box cover. Remove both wires with inte-

grated fuses (fixed with flat pin bushings (2), see figure). Mount the

new wires (flat pin bushings) and close the terminal box. Fasten the

cover with the four screws.

Switch off the pump.

Disconnect the electrical power cord before opening

the terminal box. After disconnecting from power,

wait

two minutes to allow the capacitors to discharge.

+

The replacing of the fuse has to be carried out by a

trained electrician.

+

After replacing the fuse, the pump must be checked for

electric safety (see below)! Identify and eliminate the

cause of failure before switching on the pump again.

Advertising
This manual is related to the following products: