Figure 5-1. Location of Stabilizing Reactor Bypass Terminals (Single-Phase Relays)

Equipment Required
Because of the speed and sensitivity of the BE1-87G, test equipment with appropriate accuracy and

stability must be used to test the sensitivity switch settings. For example, at the most sensitive switch

setting (0.1 ampere), the relay monitors a current difference that is only 1% for a sensing input of 10

amperes.

Two adjustable current sources (Doble, AVO, or equivalent equipment)

Digital voltmeter (±1% accuracy or better)

Digital ammeter (±1% accuracy or better)

Variable, 0 to 250 Vac/Vdc power supply (for relay operating power)

DC power supply (for current operated targets)

Single-Phase/A-Phase Trip and Dropout Test
Perform the following steps to test the trip and dropout accuracy of relays with single-phase sensing (style

number Sxx-xxx-xxxxx) or phase A of relays with three-phase sensing (style number Gxx-xxx-xxxxx).
1. Connect the test setup shown in Figure 5-2. Current sensing connections should be made at

terminals 6, 7, 8, and 9.

2. Set the sensitivity switch at position A.
3. Apply the appropriate voltage to relay operating power terminals 3 and 4. (A power supply

model/input voltage cross-reference is provided in Table 1-1.)

4. Using a regulated, independently adjustable current source, apply the restraint current to relay

terminals 6 and 9. A current value of 0.1 Aac is applied for relays with style number x1x-xxx-xxxxx

and a current value of 0.02 Aac is applied for relays with style number x2x-xxx-xxxxx.