SECTION 3 - INSTALLATION AND OPERATION

3-1 PBC-II

UNPACKING

• The unit is delivered on a pallet, secured using metal bands. On removing the PBC-II from the pallet, be

sure to keep the protective wrapping in place. Use the following procedure to unpack the unit.

• Position the pallet away from walls or other obstructions.

• Be sure pallet is sitting level where bands can not hit anything.

CAUTION

WARNING!

Exercise extreme caution as you cut the metal bands. They are under tension and may
cause injury.

• Carefully remove the cardboard cover from unit; avoid puncturing the plastic bubble wrap with any sharp

object that may damage the surface of unit.

• The bubbles wrap covers the PBC-II and should be removed at location when the unit is to be mounted.

• Save the packing material to allow it to be used to keep the unit covered and protected until start- up.

• Place units in location where it’s used, then remove protective plastic film.

• Before final positioning of unit, verify that all cable routing and raceway are in the correct position.

3-2 INSPECTION

• Inspect the PBC-II for obvious damage or safety hazards that may have occurred during shipping or

handling of unit.

Inspect all units when received and before use.

• Inspect four (4) batteries located on each of the bottom and middle shelf to verify for no physical

damages nor any leakage thru battery.

Report any damage immediately to the originating factory, or to an authorized representative.

Initiate Freight damage claims with the carrier as soon as possible.

• Compare the contents and model numbers with the packing list to ensure that all of the items were

received.