Online power – OnLine Power Telecommunication User Manual

Page 35

Advertising
background image

OnLine Power

3-5

REV A

3-7

POWER BACKUP CABINET TO POLE GROUNDING

• Install the ground jumper and ground cables at external ground pad as shown in Illustration 3-2 and

Table 3-1 Ground Kit.

TABLE 3-1

Part of List 35 or 36 (see Appendix B)

POLE MOUNTING CABINET GROUND KIT

ITEM DESCRIPTION

QTY

OLP

P/N

1

Compression Connector, 6 AWG, 2 Hole Lug

2

1200-182

2

M6 x 16 mm, Screw, Hex Head, S.S.

4

1800-300

3

M6, Washer, Split, S.S.

4

1825-085

4

M6, Washer, Flat, S.S.

4

1825-084

5

6 AWG, Wire Stranding, Green, Grounding by 26 inches

2

4000-090

6

2 AWG, Wire Strand, Green, Grounding Bus, reference only Contractor
Supplied

x

Contractor

Supplied

7

C-Tap, 12-1/0 AWG Burndy

2

1200-171

• Inspect the ground jumper and ground cable connections for good crimp.

• Inspect the ground connection in both rear corners of the cabinet to the lower left, rear corner of the

door at the hinge side.

• Inspect the M 6 hex head screws for torque of 7.7 ( N 2 m ) compression lugs on lower rear

corners.

• Tighten all bolts to a torque of 7.7 ( N 2 m ). Apply one drop of Torque-Seal to each bolt.

3-8

POWER BACKUP CABINET GROUNDING TEST

• Grounding Test requires a Digital Multimeter similar to a Fluke model 87 True rms. MULTIMETER,

• With a MULTI-METER check the resistance between the ground pole cable to the grounding of the

cabinet door, the reading shall be less than 0.01 ohms.

• With a MULTI-METER check the resistance between the ground pole cable to the TB1-3, the

reading shall be less than 0.01 ohms.

CAUTION

Make sure ALL POWER to PBC-II is Tagged Out & LOCK “OFF” Before working on the
Power Backup Cabinet Electrical System.

Advertising
This manual is related to the following products: