Visara CNA-8000 Installation User Manual

Page 21

Advertising
background image

CNA-8000 Installation and Configuration

707158-003

1-13

Powering Up the CNA-8000

If you are applying an IP address, insert the floppy with the FEP4600.ini file into the
floppy drive before applying power. With one or both power cables attached to the CNA-
8000 and a power source, press the power button (button is located in the upper right
corner of the front of the platform) to apply power.

Power Button


If none of the indicators light up with the power applied, recheck the power cable
connections and check any power switches or circuit breakers associated with your power
source.

Once the power up sequence has completed (should take less than 5 minutes), you should
be ready to configure the CNA-8000 with your browser or through the local console
interface.


Advertising