General maintenance, 1 schedule for maintenance inspection – Epson G3 Series User Manual

Page 78

Advertising
background image

Maintenance 1. Safety Maintenance

68

G3 Rev.1

CAUTION

■ Be sure to connect the cables properly. Do not allow unnecessary strain on the

cables. (Do not put heavy objects on the cables. Do not bend or pull the cables
forcibly.) The unnecessary strain on the cables may result in damage to the
cables, disconnection, and/or contact failure. Damaged cables, disconnection,
or contact failure is extremely hazardous and may result in electric shock and/or
improper function of the robot system.


2. General Maintenance

This chapter describes maintenance inspections and procedures. Performing maintenance
inspections and procedures properly is essential for preventing trouble and ensuring safety.
Be sure to perform the maintenance inspections in accordance with the schedule.

2.1 Schedule for Maintenance Inspection

Inspection points are divided into five stages: daily, monthly, quarterly, biannual, and
annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection points
must be added every 250 hours, 750 hours, 1500 hours, and 3000 hours operation.

Inspection Point

Daily

inspection

Monthly

inspection

Quarterly

inspection

Biannual

inspection

Annual

inspection

1 month (250 h)

2 months (500 h)

3 months (750 h)

4 months (1000 h)

5 months (1250 h)

6 months (1500 h)

7 months (1750 h)

8 months (2000 h)

9 months (2250 h)

10 months (2500 h)

11 months (2750 h)

12 months (3000 h)

13 months (3250 h)

Inspect every d

ay

h = hour

Advertising