Empire Comfort Systems pmn User Manual

Page 12

Advertising
background image

Page 12

15627-4-0806

x 19 3/8" heat shield with the front of the appliance. Align the

(4) tabs with clearance holes on the 12" x 19 3/8" heat shield

with the (4) screw holes on the heat exchanger top. Attach the

12" x 19 3/8" heat shield to the heat exchanger top with (2)

1/2" hex-head screws removed in Step 5 and (2) 1/2" hex-head

screws provided in hardware package.

6. Place the casting top onto the casting. The casting top nests

into the casting.

7. Insert center stone inlay, left stone inlay and right stone inlay

into casting top.

8. Installation of stone inlay is completed.

Parts List

Whenever the standard grill top is replaced with a stone inlay you

must install the top shield and heat shield, which are provided

with the stone inlay.

Installation of Optional Stone Inlay

1. Remove left grill, center grill and right grill from casting

top.

2. Remove casting top from outer casting.

3. Place the casting top on a non-abrasive surface in order to

protect the porcelain finish. The exterior of the casting top

should be facing the non-abrasive surface.

4. Attach 11 5/8" x 11 5/8" top shield to the interior of the casting

top with (1) 3/8" bolt provided in hardware package.

5. Remove the (2) 1/2" hex-head screws located on the front of

the heat exchanger top. The screws are 8 3/4" apart. Do not

remove the center hex-head screw. Remove the (2) screw hole,

knockouts located on the back of the heat exchanger top. The

knockouts are 8 3/4" apart. Position the angled front on the 12"

12. The following procedure will provide a snug fit between the

casting front and the casting sides. Grasp the right, front leg,

push inward on the leg in order to provide a snug fit between

the casting front and the casting side. Continue to hold the

right, front leg as you completely tighten the (2) 3/8" bolts that

attach the leg pad to the right, casting side. Repeat procedure

for left, front leg to achieve a snug fit between the casting

front and the casting side.

13. Remove the casting front from the casting.

14. Refer to Figures 10 and 11, the appliance firebox can now

be inserted into the casting. Center the firebox in the casting.

Attention: Remove (1) Phillips-head screw in the top of the

valve cover. The screw is used to secure the valve cover in

place during shipping. The (1) Phillips-head screw can be

discarded.

Figure 10

Figure 11

15. Refer to Figure 12, align (4) clearance holes on rear cover

with screw holes in (2) upper mounting brackets and diverter

back assembly. Attach firebox to rear cover with (4) 10 x 1/2"

screws.

16. Attach casting front to casting as described in Step 11.

17. Place the casting top onto the casting. The casting top nests

into the casting.

18. Insert center grill, left grill and right grill into casting top.

19. Level appliance by adjusting leveling bolts.

20. Assembly of stove casting is completed.

ASSEMBLY OF STOVE CASTING (continued)

OPTIONAL STONE INLAY INSTALLATION

Part Description

Part Number Quantity Supplied

11 5/8" x 11 5/8" Top Shield

CI-091

1

12" x 19 3/8" Heat Shield

CI-092

1

3/8" Bolt

R-3646

1

1/2" Hex-Head Screw

R-2737

4

Advertising