DOWNFLOW AND HORIZONTAL CONVERSION

These air handler units are supplied ready to be installed in a upflow,

downflow and left or right hand horizontal position.
If the unit is to be installed with an evaporator coil, refer to Figure 1 for

unit positioning information.

AIR HANDLER AND COIL UPFLOW AND

HORIZONTAL

1.

Apply neoprene gasket to top of coil casing.

2.

Position blower casing over coil opening.

3.

Attach tie plate to casings of air handler and coil using screws.

4.

Remove blower access panel and coil filter door.

5.

Disconnect wiring to blower motor. *Note location of wires as these
will be reconnected in a later step.

6.

Remove blower motor and housing.

7.

Fasten duct flanges of coil to duct flanges of air handler with

screws. See Figure 1.

8.

Secure base of air handler to top of coil using screws.

9.

Locate 2” wide foam gasket.

10. On the interior of the air handler/coil attachment point, apply foam

gasket over duct flanges on the sides and back.

11. Reinstall blower motor and housing by reversing the process in

Steps 3 and 4.

12. Complete electrical and blower speed connections as outlined in

other sections of this document.

13. Reposition and replace blower access panel.

AIR HANDLER AND COIL DOWNFLOW

1.

Position blower casing over duct connection and secure such that

the supply air end of the blower is down.

2.

Apply neoprene gasket to return-air side of air handler.

3.

Place coil casing over blower return opening.

4.

Attach tie plate to casings of air handler and coil using screws.

5.

Remove blower access panel and coil filter door.

6.

Disconnect wiring to blower motor.
*Note location of wires as these will be reconnected in a later step.

7.

Remove blower motor and housing.

8.

Fasten duct flanges of coil to base of air handler with screws. See

Figure 1.

9.

Secure base of air handler to base of coil using screws.

10. Locate 2” wide foam gasket.
11. On the interior of the air handler/coil attachment point, apply foam

gasket over duct flanges on the sides and back.

12. Reinstall blower motor and housing by reversing the process in

Steps 3 and 4.

13. Complete electrical and blower speed connections as outlined in

other sections of this document.

14. Reposition and replace blower access panel.

FIGURE 1: Typical Installation with MC or FC Evaporator Coil (MC required for horizontal applications)

UPFLOW

DOWNFLOW

HORIZONTAL RIGHT

HORIZONTAL LEFT

FIGURE 2: Coil and Air Handler Attachment Details

TIE PLATE

COIL

AIR HANDLER

COIL

TOP PLATE

AIR HANDLER

DOWNFLOW

APPLICATION

UPFLOW & HORIZONTAL

APPLICATIONS