Thermostat, Sample capillary, 10 thermal block assembly – Emerson Process Management ROSEMOUNT NGA2000 HFID User Manual

Page 50: Model nga2000 hfid

Advertising
background image

Instruction Manual

748297-E
June 2003

4-12 Maintenance and Troubleshooting

Rosemount Analytical Inc. A Division of Emerson Process Management

Model NGA2000 HFID

Capillary

Cover

Thermostat

1. Remove oven from analyzer module

per Section 4-2a on page 4-3.

2. Remove burner/thermal block from

oven per Section 4-2b on page 4-4.

3. Refer to Figure 4-9 on page 4-11.

Remove the two retaining screws, pull
thermostat out.

4. Install replacement thermostat, attach

with the two retaining screws.

5. Install burner/thermal block into oven.

6. Install oven into analyzer module.

Sample Capillary

1. Remove oven from analyzer module

per Section 4-2a on page 4-3.

2. Remove burner/thermal block from

oven per Section 4-2b on page 4-4.

3. Remove burner from thermal block

per Section 4-2c on page 4-7.

4. Refer to Figure 4-10 below. Remove

the two screws securing the capillary
cover to thermal block, remove cover.

5. Remove capillary nut, remove capil-

lary.

6. Install replacement capillary.

7. Insert capillary into thermal block.

The capillary may require bending to
fit.

8. Install

cover.
















Figure 4-10.

Thermal Block Assembly

Advertising