Emulex NQTR0V-NATM User Manual

Page 39

Advertising
background image

Printer Server Installation 2-19

Print Test Page

The test page is a helpful tool that can be used to verify the connection
between the printer server and the printer. The test page contains the
following data:

reference when configuring the printer server. The print out contains
default and recently changed information

Print

er

sS

erver

nN

ame

MAC Address

D

D

efault remote

pP

rinter

nN

ame Node

Nn

ame

Hardware &

fF

irmware revisions

NOS

iI

nformation

S

S

oftware revision

Network

pP

rotocols

This procedure assumes that at least one printer is connected.

1) Verify the Emulex printer server has power.

2) Verify printer has power and is On-Line.

3) Disconnect power to the printer server.

4) Disconnect LAN cable.

5) Reconnect power to printer server.

6)

The printout will occur within 90 seconds.

If no printout occurs, verify all connections and make sure printer shows
power ON, Ready and On-Line.

NOTE: If the printer is PCL or text only, the test printout

may contain PostScript commands.

Advertising
This manual is related to the following products: