3 power requirements – Frymaster FPH1721 User Manual

Page 13

Advertising
background image

EH1721 SERIES ELECTRIC FRYERS

CHAPTER 2: INSTALLATION INSTRUCTIONS

2-5

3. Close fryer drain-valve and fill frypot with water to the bottom OIL LEVEL line.

4. Boil out frypot prior to first use. See Frypot Boil-Out instructions in Section 2.4.

5. Drain, clean, and fill frypot(s) with cooking oil. See Section 2.5, Equipment Setup and Shutdown

Procedures.


2.3 Power Requirements

DANGER

Copper wire suitable for at least 167°F (75°C)

MUST be used for power connections.

MODEL VOLTAGE

PHASE

WIRE

SERVICE

MIN.

SIZE

AWG

(mm2)

AMPS PER LEG

L1 L2 L3

17 kW

208

3

3

6

(16)

48

48

48

17 kW

240

3

3

6

(16)

41

41

41

17 kW

480

3

3

6

(16)

21

21

21

17 kW

220/380

3

4

6

(16)

26

26

26

17 kW

240/415

3

4

6

(16)

24

24

24

17 kW

230/400

3

4

6

(16)

25

25

25

21 kW

208

3

3

4

(25)

58

58

58

21 kW

240

3

3

4

(25)

51

51

51

21 kW

480

3

3

6

(16)

25

25

25

21 kW

220/380

3

4

6

(16)

32

32

32

21 kW

240/415

3

4

6

(16)

29

29

29

21 kW

230/400

3

4

6

(16)

30

30

30

DANGER

The electrical power supply for this appliance

MUST be the same as indicated on the rating

and serial number plate located on the inside of the fryer door.

DANGER

This appliance

MUST be connected to the voltage and phase specified on the rating and

serial number plate located inside the fryer door.

DANGER

All wiring connections for this appliance

MUST be made in accordance with the wiring

diagrams furnished with the equipment. Wiring diagrams are located inside the fryer door.

Advertising