START-UP CHECKLIST FOR UNIT

Unit Model Number ____________________________ (e .g . HRE-55)

Unit Serial Number ____________________________ (e .g . 04C99999)

Energy Wheel Date Code ____________________________ (e .g . 0450)

Start-up date ____________________________ (MM/DD/YYYY)

Start-up Personnel Name ____________________________

Start-up Company ____________________________

Phone Number ____________________________

Pre-Start Up Checklist -

check boxes as items are completed

o

Disconnect and lock-out all power switches

o

Remove any foreign objects that are located in the energy recovery unit .

o

Check all fasteners, set-screws, and locking collars on the fans, bearings, drives, motor bases and

accessories for tightness .

o

Rotate the fan wheels and energy recovery wheels by hand and ensure no parts are rubbing . If rubbing

occurs, refer to Start-Up section for more information .

o

Check the fan belt drives for proper alignment and tension (refer to Start-Up section for more

information) .

o

Filters can load up with dirt during building construction . Replace any dirty pleated filters and clean the

aluminum mesh filters in the intake hood (refer to Routine Maintenance section) .

o

Verify that non-motorized dampers open and close properly .

o

Check the tightness of all factory wiring connections .

o

Verify control wire gauge (refer to the Electrical Connections section) .

o

Verify diameter seal settings on the energy recovery wheel (refer to Start-Up section for more

information .

o

Verify proper drain trap installation (refer to Drain Trap section) .

o

For plenum or BI fans, check the radial gap and overlap . Adjust if necessary .

Every installation requires a comprehensive start-up to ensure proper operation of the unit . As part of
that process, the following checklist must be completed and information recorded . Starting up the unit in
accordance with this checklist will not only ensure proper operation, but will also provide valuable information
to personnel performing future maintenance . Should an issue arise which requires factory assistance, this
completed document will allow unit experts to provide quicker resolve . Qualified personnel should perform
start-up to ensure safe and proper practices are followed .

SAFETY CAUTION!

Use caution when removing access panels or other

unit components, especially while standing on a

ladder or other potentially unsteady base . Access

panels and unit components can be heavy and

serious injury may occur .

SAFETY CAUTION!

Do not operate energy recovery ventilator without

the filters and birdscreens installed . They prevent the

entry of foreign objects such as leaves, birds, etc .

SAFETY DANGER!

Electric shock hazard . Can cause injury or death .

Before attempting to perform any service or

maintenance, turn the electrical power to unit to OFF

at disconnect switch(es) . Unit may have multiple

power supplies .

CAUTION!

Do not run unit during construction phase . Damage

to internal components may result and void warranty .