Start-up checklist for unit – Greenheck Fan HEAT RECOVERY UNIT WITH EVAPORATIVE COOLING HRE-20 User Manual

Page 30

Advertising
background image

30

Line Voltage - check at unit disconnect

L1-L2

________ Volts

L2-L3 ________ Volts

L1-L3 _______ Volts

Motor Amp Draw:

Supply Motor Amps

L1

________ Amps L2

________ Amps

L3 ________ Amps

Exhaust Motor Amps

L1

________ Amps L2

________ Amps

L3 ________ Amps

Fan RPM:

Supply Fan RPM _____________

Exhaust Fan RPM _____________

Correct fan rotation direction:

Supply Fan

Yes / No

Exhaust Fan

Yes / No

Start-Up Checklist

The unit will be in operational mode during start-up . Use necessary precautions to avoid injury . All data must
be collected while the unit is running . In order to measure volts & amps, the control center door must be open,
and the unit energized using a crescent wrench to turn the disconnect handle .

Special Tools Required

Voltage Meter (with wire probes)

Amperage Meter

Incline manometer or equivalent

Tachometer
Thermometer

START-UP CHECKLIST FOR UNIT

START-UP CHECKLIST FOR EVAPORATIVE COOLER

Evaporative coolers are an integral part of the unit and must be set up properly . Doing so will ensure correct
operation and avoid water or leakage problems . HRE units will have one or two evaporative coolers . The
following checklist must be completed for each evaporative cooler . Qualified personnel should perform
installation and be present for start-up to ensure safe and proper practices are followed . Please refer to the
Evaporative Cooling Modules section for detailed information on start-up items below .

Indirect Evap

Direct Evap

Connect overflow line (run bleed line into overflow)

o

o

Connect drain line

o

o

Install trap

o

o

Connect water supply line

o

o

For units with Auto Drain & Fill with Freeze Protection

Install, wire, and provide power to components

o

o

Confirm temperature and timer settings

o

o

Pump filter clean and installed properly

o

o

Saturate media per IOM

o

o

Adjust bleed-off rate per IOM

o

o

Check for water carryover

o

o

Connect ‘Call for Cooling’ signal

o

o

Remove jumper wire

o

o

Advertising