INSTALLATION

The system design and installation should follow
accepted industry practice, such as described in the
ASHRAE Handbook .

Adequate space should be left around the unit for piping
coils and drains, filter replacement, and maintenance .
Sufficient space should be provided on the side of the
unit for routine service and component removal should
that become necessary .

See Service Clearances/Access Panel Locations section
for more details .

LIFTING

1) Before lifting, be sure that all shipping material has

been removed from unit .

2) To assist in determining rigging requirements,

weights are shown below .

3) Unit must be lifted by the eight lifting lugs provided

on base structure .

4) Rigger to use suitable mating hardware to attach to

unit lifting lugs .

5) Spreader bar(s) must span the unit to prevent

damage to the cabinet by the lift cables .

6) Always test-lift the unit to check for proper balance

and rigging before hoisting to desired location .

7) Never lift units by weatherhoods.
8) Never lift units in windy conditions.
9) Preparation of curb and roof openings should be

completed prior to lifting unit to the roof .

10) Check to be sure that gasketing (supplied by others)

has been applied to the curb prior to lifting the unit
and setting on curb .

11) Do not use fork lifts for handling unit .

Lift using
lifting lugs and
spreader bar

UNIT WEIGHTS & RECOMMENDED ROOF OPENING

SUPPLY
OUTLET

EXHAUST

INLET

U

V

0.50

0.50

Unit Size

Approx. Dry Weight

(lbs)

Approx. Wet Weight

(lbs)

U

V

HRE-20

1660

1800

46

37

HRE-45

2580

2840

54

39

HRE-55

2950

3320

65

47

HRE-90

4750

5400

85

49

SAFETY WARNING

All factory provided lifting lugs must

be used when lifting the units . Failure

to comply with this safety precaution

could result in property damage,

serious injury, or death .

Unit weights assume indirect evap, direct evap, and IG furnace .
All dimensions shown are in inches .

Position the unit roof opening such that the supply discharge and exhaust inlet of the unit will line up with the
corresponding ductwork . Be sure to allow for the recommended service clearances when positioning opening
(see Service Clearances) . Do not face the outdoor air inlet of the unit into prevailing wind and keep the supply
inlet of the unit away from any other exhaust fans . Likewise, position the exhaust discharge opening away from
fresh air intakes of any other equipment .
When cutting only duct openings, cut opening 1 inch (25mm) larger than duct size to allow clearance for
installation . Area enclosed by roof curb must comply with clearance to combustible materials . If the roof is
constructed of combustible materials, area within the roof curb must be ventilated, left open, or covered with
non-combustible material which has an ÒRÓ value of at least 5 . If area within curb is open, higher radiated
sound levels may result .
Where the supply or warm air duct passes thru a combustible roof, a clearance of one inch must be maintained
between the outside edges of the duct and combustible material in accordance with NFPA Standard 90A.