Typical assembly overview (pts 40ft shown) – Gas-Fired Products Infrared Radiant Tube Heater PTS Series User Manual

Page 16

Advertising
background image

Form #43343330

May 08

–15–

8.2)

HEATER ASSEMBLY / JOINING OF TUBE SECTIONS




Typical

Assembly Overview

(PTS 40FT

Shown)

4"OD x 10Ft.

T

ube

See section

7

for required tubes.

Tube

Support

Bracket

U-Bolt Clamp & 5/16" Hex Nut

s

Mounting

Flange

24 Hole for

Aluminized S

teel

Tubes

6 Hole for

Alumi-Therm S

teel

Tubes

Wire Hanger

Gasket

Burner Box

Flue Terminal

5 hanging point

s to be used for suspension for a typical 40f

t

long system.

There must be two hanging point

s on the first

tube and one on each of the other tubes

Maximum 6” dist

ance

from burner box to the tube support/hanger bracket.

- 9’

¼”

- 10’

- 10’

Not Less Than 10”

#10 Self-Drill Screws (T

ypical all tube support

s,

tube couplings and flue terminal.)

Typical Overlap

Turbulator (See specifications section 5 for required quantities.)

Tube Coupling (T

ypical each tube joint

.)

Burner Box Suspension Chain

Advertising
This manual is related to the following products: