Step 1, Step 3, Step 4 – Gas-Fired Products Infrared Radiant Tube Heater PTS Series User Manual

Page 48: Step 2, 2) removal of gas valve and manifold assembly, 3) air switch pressure check

Advertising
background image

Form #43343330

May 08

–47–

23.2)

REMOVAL OF GAS VALVE AND MANIFOLD ASSEMBLY

Step 1

Remove side

access panel.

Loosen screws from

manifold clamp and

burner assembly.

Step 3

Open hinged access

panel and disconnect

wires from gas valve.

Step 4

Remove (6) screws from

end panel. Rotate gas valve

and manifold assembly

slightly counter-clockwise

and slide out from housing.

Step 2

23.3)

AIR SWITCH PRESSURE CHECK

P1

+

P2

-

P1

+

P2

-

0.65” WC

+

-

Connector

Tees

Air

Switch

Digital or Inclined

Water Manometer

scale 0-2”w.c.

Temporary 1/4” ID Silicone /

plastic tubing for pressure

test.

Common “C”

Normally

open “NO”

Advertising
This manual is related to the following products: