Typical assembly overview (ptu 40ft shown) – Gas-Fired Products Infrared Radiant Tube Heater PTS Series User Manual

Page 17

Advertising
background image

Form

#43343330

–16–

May 08


Typical Assembly Overview

(PTU 40FT Shown)

Wire Hanger

Flue

Terminal

#10 Self-Drill Screws

(Typical all tube supports,

tube couplings and flue

terminal.)

4"OD x 10Ft. Tube

See section 7

for required tubes.

13” Tube Support Brk.

with U-Bolt Clamp

& 5/16" Hex Nuts

Mounting Flange

24 Hole for Aluminized Steel Tubes

6 Hole for Alumi-Therm Steel Tubes

Gasket

Burner Box

Typical

Overlap

U-Bend

Tube Coupling

(Typical each tube joint.)

Reflector

31” Tube Support Brk.

with U-Bolt Clamp

& 5/16" Hex Nuts

8’ - 10’

6 hanging points to be used for suspension for a typical

40ft long system. There must be two hanging points

on the first tube and one on each of the other tubes

Maximum 6” distance

from burner box to the

tube support/hanger

bracket.

8’ - 9’ ¼”

#10 Self-Drill

Screws

(2 each)

Turbulator

(See specifications

section 5 for required

quantities.)

Burner Box

Suspension

Chain








Advertising
This manual is related to the following products: