Host – IBM DS6000 User Manual

Page 319

Advertising
background image

Chapter 23. Global Mirror options and configuration

295

Last but not least, if you did not already establish the FlashCopy relationship from B to C
during the Failover - Failback sequence at the remote site, then you have to do it now. This
may be an inband FlashCopy as shown in Figure 23-19.

A TSO command example is provided in Example 23-13.

Example 23-13 Establish FlashCopy from B to C via inband TSO command

//* ---------------------------- TSO ------------ CREATE (3) ----- ***
//* FLASHCOPY B -> C START CHANGE RECORDING NOCOPY ETC. THROUGH ***
//* MODE(ASYNC) OPTION (GET READY FOR GM) ***
//* -------------------------------------------------------------- ***
//* Inband Command 2C00 is Global Copy primary ***
//* LSS 0C CAA 00 is Global Copy secondary ***
//* and FlashCopy source ***
//* LSS 0D CAA 00 is FlashCopy target ***
//* -------------------------------------------------------------- ***
//FCESTBL EXEC PGM=IKJEFT01
//SYSPRINT DD SYSOUT=*
//SYSTSPRT DD SYSOUT=*
//SYSTSIN DD DDNAME=SYSIN

FCESTABL DEVN(X'2C00') SOURCE(73081 00 0C) +
TARGET(73081 00 0D) +
REMOTE(YES) SSID(3C00) MODE(ASYNC)

The last step is to start the Global Mirror session again, as shown in Figure 23-20. Then the
application may resume at the local site.

Figure 23-20 Start Global Mirror session and resume application I/O at the local site

Global Copy

Primary

Primary

A

Primary

Primary

A

Tertiary

C

Primary

Primary

A

Primary

Primary

A

B

Remote site

Local site

Primary

Primary

A

Primary

Primary

A

A

Secondary

PENDING

Host

Primary

PENDING

Start session

FlashCopy

Advertising