System Thermal/Mechanical Design Information

Thermal and Mechanical Design Guidelines

39

Figure 18. Shock Acceleration Curve

0

10

20

30

40

50

60

0

2

4

6

8

10

12

Time (m illiseconds)

A

c
c
e

l

e
r
a

t
i

o
n

(g)

4.2.1.2.1 Recommended Test Sequence

Each test sequence should start with components (i.e. motherboard, heatsink

assembly, etc.) that have never been previously submitted to any reliability testing.

The test sequence should always start with a visual inspection after assembly, and

BIOS/CPU/Memory test (refer to Section 4.2.1.2.2).

Prior to the mechanical shock & vibration test, the units under test should be

preconditioned for 72 hours at 45 ºC. The purpose is to account for load relaxation

during burn-in stage.

The stress test should be followed by a visual inspection and then BIOS/CPU/Memory

test.

4.2.1.2.2 Post-Test Pass Criteria

The post-test pass criteria are:
1. No significant physical damage to the heatsink attach mechanism (including such

items as clip and motherboard fasteners).

2. Heatsink must remain attached to the motherboard.
3. Heatsink remains seated and its bottom remains mated flatly against die surface.

No visible gap between the heatsink base and processor die. No visible tilt of the

heatsink with respect to its attach mechanism.

4. No signs of physical damage on motherboard surface due to impact of heatsink or

heatsink attach mechanism.

5. No visible physical damage to the processor package.
6. Successful BIOS/Processor/memory test of post-test samples.
7. Thermal compliance testing to demonstrate that the case temperature

specification can be met.