5 external battery cabinet installation, External battery cabinet installation, Caution – Liebert GXT2-6000RTL630 User Manual

Page 22

Advertising
background image

Installation and Configuration

18

5.5

External Battery Cabinet Installation

Optional Liebert external battery cabinets may be connected to the UPS to provide additional battery

run time. External battery cabinets are designed to be placed on one side of the UPS or stacked

beneath the UPS.

1. Visually inspect the external battery cabinet for freight damage. Report damage to the carrier

and your local dealer or Liebert representative.

2. For slide rail installations, first remove the top/side fin. Top/side fin slides forward and then lift

up to remove. Optional rack-mount handles are shipped with the external battery cabinet and

may be installed at this time if desired.

3. Securing hardware and slide rails are sold separately. Please contact your local dealer or Liebert

representative for these additional options and any assistance needed. Fasten the slides into

position with the screws per the instructions included with the slide rails.

4. Use the enclosed support bases for the tower option to prevent tip-over. One additional set of

support base extensions ships with each external battery cabinet.

5. Connect the supplied external battery cabinet cable to the rear of the external battery cabinet,

then to the rear of the UPS.

6. The UPS is now equipped with additional backup battery run time. For approximate battery run

times, refer to Table 5.

!

CAUTION

The external battery cabinet(s) are heavy (see 13.0 - Specifications). External battery

cabinets can be used in rack-mount or tower configuration. Take proper precautions when

lifting them.

!

CAUTION

Do not turn on (close) the battery cabinet circuit breaker yet. Complete the installation first.

NOTE
You must use the included configuration program to program the UPS for the number

of external battery cabinets connected. Instructions for the configuration program are in

7.0 - Configuration Program.

OUTPUT

BREAKER

20A 240V~/T

OUTPUT

BREAKER

20A 240V~/T

ON

ON

INPPUT

OUTPUT ONL

Y

CB DOES NO

T

C

O

NNECT BYP

A

SS POWER

T

O

MANU

AL BYP

A

SS SWIT

CH.

BREAKER 30A

ON

OFF

OFF

OFF

UPS

UTILIT

Y

C

OMMUNICA

T

ION PORT

SEE MANU

AL

FOR C

O

NNECTIONS

OFF

REPO

RELA

Y CARD

USB/WEB CARD

MAIT

ANENCE BYP

A

SS

A

V

AILABLE

UPS

A

V

AILABLE

A

T

TA

CH JUMPER

HERE FOR SHIPPING

AND EX

TENDED

ST
ORA

G

E

EX
T. BA
T

T

ER
Y

240V 25A

ON

OUTPUT BREAKER

30A/250V~T

-

INTERNAL BA

T

T

ER
Y

C

O

NNECT

OR INST

ALL

BEFORE OPERA

T

ING

+

3U

2U

2U

Spacers added to support

base to accommodate

additional battery cabinets

Advertising