Nortel Networks NN44200-300 User Manual

Page 24

Advertising
background image

24

Chapter 3 Preparing for installation

Step

Description

Check

2

Unpack the server, and ensure you have all the items you need (see

"Unpacking the 1002rp server" (page 26)

).

Complete the following checklists that are provided in the Installation and
Configuration Task List
(NN44200-306):

"CallPilot software media and documentation checklist"

"CallPilot server hardware checklist"

3

Remove the front bezel and server cover, and inspect the interior (see pages

"Removing the front bezel and server cover" (page 27)

and

"Inspecting the

server interior" (page 29)

).

4

Replace the server cover.

5

Install the power supply modules in the server (see

"Installing the second

power supply module (AC or DC)" (page 34)

).

6

For a DC-powered server, set up the DC power source (see

"DC wire gauge

tables" (page 36)

).

7

Place the 1002rp server in the chosen location (see

"Installing the server"

(page 43)

).

8

Replace the front bezel (see page

"Inspecting the server interior" (page 29)

).

9

Set the DIP switches on the modem (see

"Preparing the modem" (page 44)

).

Connect the 1002rp server and devices as follows:

Connect the monitor, keyboard, and mouse (see

"Connecting peripherals to

the server" (page 47)

).

Connect the modem (see

"Preparing the modem" (page 44)

).

Connect the 1002rp server to the ELAN hub or switch (Meridian 1 or
Communication Server 1000 only) (see

"Connecting the server to the ELAN

subnet" (page 49)

).

ATTENTION

To comply with EMC radiation requirements, a Class A hub must be
located 10 m (33 ft.) away from the 1002rp server. Shielded Ethernet
cables must be used.

10

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300

01.01

Standard

5.0

23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

.

Advertising