Connecting the server to power – Nortel Networks NN44200-300 User Manual

Page 53

Advertising
background image

Connecting the server to power

53

Note: The parallel port is also known as the printer port or LPT1.
It is located at the back of the server. See the diagram on page

"Rear panel connectors" (page 47)

.

2

If the software feature key is not preinstalled in the dongle, remove it
from the plastic bag, and carefully insert it into the software feature
slot on the dongle. Make sure that the clips secure it properly and
that the Nortel logo faces outwards.

3

Plug the male end of the adapter into the parallel port.

4

Tighten the connector screws.

—End—

What is next?

Continue with

"Connecting the server to power" (page 53)

.

Connecting the server to power

Before you begin

Ensure that proper power and grounding are available for all the power
outlets serving the CallPilot server and its associated peripherals. Power
for these devices must be wired and fused independently of all other
receptacles, and referenced to the same ground as the PBX system.

A qualified electrician must implement the single-point ground reference as
required between the power outlets of the CallPilot server and the power
outlets of the switch.

Provide a sufficient number of properly grounded power outlets or power
bars for all equipment. For more information, refer to grounding and power
requirements in this document and in the CallPilot Planning and Engineering
Guide
(NN44200-200).

The single-point ground (SPG) required by the system can be an isolated
ground (IG) bus or AC equipment ground (ACEG) bus in the service panel
or transformer. The system must be connected to safety ground/protective
earth in accordance with NEC requirements. For international use, the
system must be connected to safety ground/protective earth in accordance
with Paragraph 2.5 of EN60950/IEC950.

Note: Refer to Large System: Planning and Engineering
(553-3021-120) for a complete description of approved ground sources
and methods. Insulated ground wire must be used for system grounding.

Before you connect the server to the power source, review the following
diagram to ensure that all peripheral hardware devices are in place.

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300

01.01

Standard

5.0

23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

.

Advertising