Nortel Networks Server 1005r User Manual

Page 44

Advertising
background image

44

Chapter 5 Connecting the server to power

To connect the 1005r AC server to power

Step

Action

WARNING

Risk of personal injury, risk of hardware failure

The power outlets used by the CallPilot server and its peripheral
devices must be connected to the same single-point ground
reference as the one used by the switch with MGate cards
connected to the CallPilot server. If this requirement is not
met, power transients can cause personal injury, hardware
failure, or both. See the Installation and Configuration Task List
(NN44200-306) for more information about single-point grounding
requirements.

1

Plug the server AC power cords into the server rear panel.

2

Plug the other ends into an approved wall receptacle or power bar.

—End—

To start the server

Step

Action

1

Press the server power switch to start the server.

2

Observe the Power-On Self Test (POST) and initialization messages
on the monitor.

3

Let the mini-setup sequence run until you are prompted to log on
to the operating system.

Note: The system can perform multiple reboots. This is normal.

4

Ensure that the operating system logon window appears on the
monitor.

Note: If the logon window does not appear, see the 1005r
Server Maintenance and Diagnostics
(NN44200-704) guide for
troubleshooting instructions.

5

Log into Windows.

6

CallPilot Manager wizard starts automatically.

Nortel CallPilot

1005r Server Hardware Installation

NN44200-308

01.06

Standard

5.0

15 May 2008

Copyright © 2006-2008, Nortel Networks

.

Advertising