Relocating/storing the server – NEC Express5800/120Rh-2 N8100-1126F User Manual

Page 235

Advertising
background image

Maintenance 7-11

RELOCATING/STORING THE SERVER

Follow the procedure below to relocate or store the server:

CAUTION

Observe the following instructions to use the server safely. Failure to follow
these instructions may cause a fire, personal injury, or property damage. See
pages 1-3 to 1-8 for details.

„

Never attempt to lift the server only by yourself.

„

Do not install the server in any place other than specified.

„

Do not connect/disconnect any interface cable with the power cord of the
server plugged to a power source.

IMPORTANT:

„

If the server needs to be relocated/stored due to a change in the floor
layout to a great extent, contact the service representative.

„

Make sure to make a backup copy of your valuable data in the hard
disk drive, if any.

„

Make sure not to apply a shock to hard disk drives to relocated the
server if the contains any.

1.

Take a floppy disk and a CD-ROM out of the server, if any.

2.

Power off the server (the POWER/SLEEP LED goes off).

3.

Unplug the power cord of the server from a power outlet.

4.

Remove all the cables from the server.

5.

Hold the server by its bottom with at least three persons to carry the server.

IMPORTANT:

Do not hold the front door to lift the server. The

front door may be disengaged from the server, causing personal injury.

6.

Protect the server with the shock-absorbing materials, and pack it securely.

Advertising