Downgrade a full system navigation, Preparing for full system downgrades – Nortel Networks Application Server 53r 5300 00 User Manual

Page 117

Advertising
background image

Downgrade a full system

117

Downgrade a full system navigation

"Preparing for full system downgrades" (page 117)

"Downgrading a redundant system" (page 118)

"Downgrading a non-redundant system" (page 118)

Preparing for full system downgrades

Before performing full system downgrades, follow the instructions in this
procedure.

Procedure Steps

Step

Action

1

(Optional) Compose a list of all Network Elements and the
servers they reside on, including the redundant Network
Elements. Use this list to keep track of which Network Elements
have been downgraded.

Application Server 5300

Nortel AS 5300 Installation

NN42040-300

01.04

4 November 2008

Copyright © 2007-2008 Nortel Networks

.

Advertising