Navigation – Nortel Networks Application Server 53r 5300 00 User Manual

Page 87

Advertising
background image

MCP core software load Maintenance Release installation

87

"Upgrading the Network Elements" (page 90)

"Upgrading the AudioCodes gateway" (page 92)

Transferring the Maintenance Release files to System Manager

Delivery options for the MCP core software load Maintenance Release are
as follows:

CD/DVD containing the Maintenance Release files

Electronic Software Delivery (ESD)

The following procedures describe how to transfer the Maintenance
Release files to System Manager for each delivery option.

Navigation

"Transferring Maintenance Release files to System Manager from a
CD" (page 87)

"Transferring Maintenance Release files to System Manager from
Electronic Software Delivery (ESD)" (page 88)

Transferring Maintenance Release files to System Manager
from a CD

Procedure Steps

Step

Action

1

Place the CD containing the MCP core load file into the CD-ROM
tray of the primary System Manager. This load will be used to
upgrade the majority of the system.

2

Log on to the System Manager as the AA role (ntappadm) using
SSH.

3

Change directory:

cd /usr/local/bin

4

Copy the files from CD:

sudo ./mcpCopyFromCD.pl -m manifest-all

The MCP 11.0 load is copied to the /var/mcp/loads directory.

The MCP 11.0 online Help zip files are copied to the
/var/mcp/media directory.

The ASU related files are copied to the /var/mcp/media/PC-Cl
ient_ASU_6.0.XXX directory.

5

Using a new SSH session, log on to the System Manager as the
AA role (ntappadm).

6

Delete older MCP loads:

Application Server 5300

Nortel AS 5300 Installation

NN42040-300

01.04

4 November 2008

Copyright © 2007-2008 Nortel Networks

.

Advertising