Ceiling panel, Installation manual, Model: rbc-u21pg (w)-e – Toshiba RAV-SM1100UT-E User Manual

Page 68: Cautions on safety, Components, Warning

Advertising
background image

65

INSTALLATION MANUAL

Ceiling Panel

MODEL:

RBC-U21PG (W)-E

Cautions on Safety

Before installation work, read this

Cautions on Safety

thoroughly.

Strictly keep the following items in mind because they describe the serious contents concerned

with safety. The indications and meanings are as follows:

After installation work, accompanied with a test run to check if there is no trouble, explain the use method and

maintenance of the unit to the customers according to Owner

’s Manual. And also ask the customers to obtain

this

Ceiling Panel Installation Manual together with Owner

’s Manual and Installation Manual of the indoor unit.

WARNING

Ask an authorized dealer or qualified installation

professional

to install the ceiling panel.

Inappropriate installation may result in water leakage, electric shock or fire if you install it by yourself.

Carry out an installation

work securely according to this Installation

Manual.

Inappropriate installation may result in water leakage, electric shock or fire.

A person qualified in the electric work should execute the electric works according to the

Installation Manual and should use the exclusive circuits. The voltage should be matched with

the rated voltage of the product.

The capacity shortage of electric circuit or inappropriate installation may result in electric shock or fire.

Never modify or repair the product.

Incomplete modification or repair may result in electric shock or fire.

Components

Never apply an excessive force on the flap. It causes a trouble.

Ceiling P

anel

Installation Manual

Name

Ceiling panel

Scre

w with washer

Scre

w

Installation manual

Q

’ty

1

Shape

4

Ø

M5mm x 40mm

Ø

M4mm x 12mm

1

4

Ø18

Flap

1. Preparation before installation of ceiling panel

2. Installation to indoor unit

(Fig. 1)

K

eep the range within 12 ,

otherwise,

a tr

ouble is caused.

+5 –

0

12

+5

–0

Indoor unit

Ceiling

surf

ace

Ceiling opening hole siz

e

Flap

Ceiling panel

Suction grille

Hook of suction grille

Hook hole of

ceiling panel

Hook of

fall-pre

v

entiv

e strap

2

1

1

1

1

(1) Position check of indoor unit

1.

Check the position of the indoor unit according to the Installation

Manual.

2.

Check the size of the ceiling opening hole, applied the following

range.

860mm x 860mm to 910mm x 910mm

3.

Using the installation gauge attached to the indoor packing, execute

positioning of the ceiling surface and the indoor unit. If position of

the ceiling surface does not match with position of the indoor unit,

air leak, water leak (dewing), or malfunction of the flap is caused.

Never put the ceiling panel downward, lean it, or leave it on a

projection to avoid a damage on the surface of the ceiling

panel.

Do not apply an excessive force on the flap when hanging it

tentatively to the indoor unit. (It causes a trouble on the flap.)

(1) Removal of suction grille

1.

Open the suction grille by sliding the hook out of the

suction grille along the arrow direction 1.

2

Take off hook of the fall-preventive strap from the

ceiling panel.

Do not take off screws of the fall-preventive

strap at the suction grille side.

3.

As the suction grille opened, remove the hinge

section of the suction grille from the ceiling panel

toward the arrow direction (2).

(2) Removal of adjust corner cap

1.

Slide the adjust corner cap along the arrow direction

1

, and then remove the adjust corner cap. (Fig. 1)

Push

Adjust cor

ner cap

Ceiling panel

Strap

1

Adjust cor

ner cap