71

INSTALLATION MANUAL

Drain-up Kit

for Concealed Duct Type Indoor Unit

MODEL: TCB-DP11BE

WARNING

Ask

the qualified

installation professional to install the drain up kit.

If drain up kit is inappropriate installed by yourself, it may cause a water

leak, an electric shock fire and so on.

Install the drain up kit surely according to this installation manual.

When re-install the drain up kit, also ask the qualified

installation

professional t

o

install it.

If drain up kit is installed by yourself, it may cause a water leak, an electric

shock fire and so on.

Configuration

REQUIREMENT

Be sure to install the drain up kit correctly according to the procedure

described in this Installation Manual. Otherwise, the position of the drain

pan on the drain up kit does not match with one on the air conditioner

body, resulting in a water leak.

Check the level of the air conditioner.

(Check that it is horizontally set or the drain port side of the air conditioner

is set with an inclination within 1

˚ downward.)

Be sure to make a check port to the lower ceiling part of the drain up kit.

*

Using the hose band, tighten the drain port and drain inlet of the drain

pan. Also, be sure to set the screw section of the hose band toward

upper side.

4

.

Cabling (See Fig. 2.)

Remove cover of the electric parts box of the air conditioner body.

Insert 3P connector (BLUE) of the drain up kit into the terminal No.

CN068 (BLUE) in the electric parts box.

Remove the short circuit connector (No. CN030) on the P.C. board in

electric parts box.

Insert 3P connector (RED) of the drain up kit into the terminal No. CN030

(RED) (Short-circuit connector is not used.)

Clamp the cable in the electric parts box.

A

B

C

D

Name

Drain up kit body

Drain hose

Hose band

Thermal insulation pipe

Q

’ty

1

1

2

1

EH99824201 (EN)

Suction panel

Air conditioner body

Drain inlet

(Drain por

t)

Drain hose

,

ther

mal insulation pipe

Drain pan

(Drain por

t)

Cab

le

Discharge

duct

Mounting scre

ws

(4 pcs

.)

Electr

ic

par

ts bo

x

Drain up kit

Drain outlet

30

Chec

k lid

P

.C

. board

T

o

drain up

Cab

le

CN030

(RED)

CN068 (BLUE)

Arrange the cab

les so

that the

y do not apply

a tension upon the

drain-up kit body and

the connector section.

CN068

(BLUE)

CN030

(RED)

Drain pump

(DP)

Float s

witch

(FS)

3

1

3

1

3

1

3

1

E

F

G

Name

Bundling band

Tapping screw

Thermal insulation tape

Float s

witch

35

Q

’ty

3

4

2

How to install drain-up kit

1

.

Installation of drain-up kit body (See Fig. 1.)

Open the cover of drain-up kit body, align the position and fasten the body

using the attached 4 tapping screws.

2

.

Hose connection (See Fig. 1.)

First connect the drain hose to pipe at the drain port of the drain up kit,

and then connect it to the drain port of the air conditioner body.

Tighten the both ends of the drain hose with hose band. In this time, be

sure to set the screw section of the hose band toward upper side.

Apply thermal insulation the drain hose with the attached thermal

insulation pipe.

Set the both ends of the drain hose closely to the drain pan.

If a gap is generated on the matched section of the thermal insulation

materials at the both ends, seal the section by winding the thermal

insulation tape.

3

.

Drain piping

Be sure to set the drain pipe from the drain up kit with falling gradient.

Support and fix the drain pipe at an appropriate position so that an

excessive load is not applied on the drain port.

Be sure to apply thermal insulation (procured locally) to the drain pipe.

<Fig. 1>

<Fig. 2>

<Fig. 3>

Test run

Condition check of water drain

After the electric work and cabling work, check the drain is smoothly discharged

by running the air conditioner in COOL mode.

If the cooling operation does not continue for a long time, pour water into the

drain pan of the air conditioner body to check whether the drain is smoothly

discharged or not.

Check there is no water leak at each connecting section.

Operation check of float switch

During cooling operation, operate the float switch.

Check the air conditioner stops the cooling operation under condition that the

drain pump keeps operating.

After operation in COOL mode, operate the float switch.

In this time, check that the drain pump works to discharge the drain.

<Position of float switch>

To handle the float switch, remove the

front panel of the kit and push up the

floating section of the float switch with a

screwdriver, etc.

Be careful not to operate the float switch

consecutively for 2

minutes or

more

because the air conditioner stops

abnormally.

Maintenance/Check

In order to put the function of the air conditioner and the drain-up kit fully to

practical use, the regular maintenance and check are necessary, together with

correct usage.

For the air conditioner body and the drain-up kit especially,

check dirt of the

drain pan once per year before cooling season and clean them if dirt is

heavy.

It is recommended to make a contract with the customers for maintenance

and check.