Installation 2-5 – TROY Group MAN-EXT2000 User Manual

Page 19

Advertising
background image

Installation 2-5

Figure 2-3

Pony Print Server Plus and Pony 100 Switches and LEDs

Step 1-b XConnect 100, Pony 100, and
Pony Print Server Plus Switches

Important Note:

Skip this step if you have an XConnect II

or XConnect II lite.

The XConnect 100, Pony 100, and Pony Print Server Plus
have a single pushbutton switch test switch (see figures 2-2
and 2-3). This switch does not need to be used during the
configuration process. It has the following functions:

• To print a self-test page, press the switch in for at least

one-eighth second but less than five seconds.

• To reset the unit back to factory default settings, press the

switch and hold it in for at least 5 seconds

Test LED (Top)

Test/Factory
switch

Power connector

Test/Factory

switch

Pony Print Server

Plus

Pony 100

Serial port

100baseTX/10baseT

connector

Power connector

TEST LED

Link LED

Advertising