2–12

975-0131-01-01

Conduit
holes/knockouts

Pre-plan the wire and conduit runs. Knockouts for 1.9 cm (3/4 inch) or 2.5 cm
(1 inch) conduit holes are located on the bottom and back of the wiring box.
Threaded 3/4

conduit holes are located on each side of the wiring box

(Figure 2-5).

For maximum safety, run AC, DC, and communication wires in separate conduits.

Planning AC Wire Routing

AC connections include all the wires and connectors between the GT Inverter AC
terminals and the main utility service panel. Pre-plan these routes carefully before
installing the components.

Planning DC Wire Routing

DC connections include all the wires and connectors between your PV array and
the DC terminals of the GT Inverter. Pre-plan these routes carefully before
installing the components.

Figure 2-5 Knockout Locations on Bottom of Wiring Box

WARNING: Shock hazard

Check for existing electrical or plumbing prior to drilling holes in the walls.

1.9 cm (3/4”) or 2.5 cm (1”) Knockouts,

also on back of Wiring Box

AC/DC Disconnect Switch

Front of Wiring Box

Left side

Right side

Back of Wiring Box

1.9 cm (3/4”) Threaded

Conduit Holes