Planning the installation, Supplied parts, Materials you need to supply – Xantrex Technology Link 1000 User Manual

Page 16: Supplied parts materials you need to supply

Advertising
background image

Planning the Installation

8

Planning the Installation

Supplied Parts

❐ Link 1000 control panel and 4 mounting screws

❐ 500 amp precision shunt

❐ 25 foot RJ11 phone cable

❐ Owner’s guide

Materials You Need to Supply

Refer to

Figure 2 on page 12

.

❐ Wire harness to connect the Link 1000 control panel to

the shunt and to the positive battery terminal. You can
use 18AWG, twisted pair, for this wiring. You can also
buy the harness from the dealer you bought the Link
1000 from or from West Marine.

Contact West Marine at:

• 1-800-BOATING (Canada and US)

• Fax: 1-831-761-4421 (Canada and US)

When ordering the harness, quote these part numbers:

• 84-2014-00: 25 foot (7.62m) 8-conductor twisted pair

wire

• 84-2015-00: 50 foot (15.24m) 8-conductor twisted pair

wire

❐ Appropriately sized copper cable and connectors to

connect the shunt to the battery and the negative bus for
DC loads

Consult a local cable supplier about cable size and
connector type. You may find it convenient to have the
cable supplier attach the connectors.

❐ 2, 2 amp fuses and fuse holders. (Three fuses and fuse

holders if you are monitoring a second battery.)

❐ 2 screws to mount the shunt

Advertising