Installing fuses, Connecting the phone cable, Testing the installation – Xantrex Technology Link 1000 User Manual

Page 25

Advertising
background image

Installing the Link 1000

17

Installing Fuses

To install fuses:

1. Install a 2 amp fuse in the fuse holder in the blue wire.

2. If you are using a starting battery, insert a 2 amp fuse in

the fuse holder in the violet wire.

3. Install a 2 amp fuse in the fuse holder in the red wire. The

fuse should be connected in a smooth motion. A
“ragged” power up may cause the Link 1000 to lock up.

The

BATTERY

STATUS

LEDs and the Numeric Display

come on. The

AC

IN

LED comes on if AC power is being

supplied to the inverter.

Connecting the Phone Cable

Plug the phone cable into the jack on the display panel
and the jack on the inverter/charger, and then clip the
display panel into the mounting plate.

Testing the Installation

After installing the Link 1000, test its operation.

To verify that the shunt leads are connected correctly:

1. Select Amps as the display unit by pressing

SEL

until the

Amps LED

comes on.

2. Make a note of the Amps reading.

CAUTION
Install the fuses in the sequence listed below to
prevent damage to the Link 1000.

CAUTION
Make sure you have made all DC power and shunt
connections before connecting the phone cable to
the inverter/charger.

Advertising