Installing the Link 1000

11

Installing the Link 1000

Overview of Installation Steps

Complete the installation in this order. Refer to

Figure 2

.

1. Mount the control panel (

page 13

).

2. Mount the shunt, and cable it to the negative battery

terminal. Cable the load side of the shunt to the negative
bus for DC loads (

page 14

).

3. Connect wires to the Link 1000 terminal block (

page 15

).

4. Connect wires from the terminal block to the shunt and to

the battery’s positive terminal (

page 16

).

5. Install the fuses (

page 17

).

6. Connect the phone cable to the control panel and the

inverter/charger (

page 17

).