Installing the link 1000, Overview of installation steps, Ep 6 on – Xantrex Technology Link 1000 User Manual
Page 19
Advertising
![background image](/manuals/226671/19/background.png)
Installing the Link 1000
11
Installing the Link 1000
Overview of Installation Steps
Complete the installation in this order. Refer to
1. Mount the control panel (
2. Mount the shunt, and cable it to the negative battery
terminal. Cable the load side of the shunt to the negative
bus for DC loads (
3. Connect wires to the Link 1000 terminal block (
4. Connect wires from the terminal block to the shunt and to
the battery’s positive terminal (
5. Install the fuses (
6. Connect the phone cable to the control panel and the
inverter/charger (