Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) PowerPack & Stinger w_EconoMind '03-05 For use with PowerPDA User Manual

Page 29

Advertising
background image

Not needed if Banks PowerPDA is

installed.
CAuTIoN: Do not use force

when working on plastic parts.

Permanent damage to the part

might result.

1.

The Power Level Selector switch

will be installed on the drivers side of

the instrument panel (IP) next to the

steering column. See Figure 38.

2.

Remove the headlamp switch

bezel on the drivers side by gently

pulling on it. Disconnect the electrical

connector once the bezel is removed.

3.

To remove the center bezel, open

the ashtray and cup holder and

remove the retaining screw. Gently

pull on the center bezel to disengage

all the clips that attach the bezel

to the dash. Disconnect the four

(4) electrical connections after the

bezel is removed. Keep the screw for

reinstallation.

4.

Remove the cluster bezel by first

removing the two (2) screws at the

top. Gently pull on it and disengage

all the clips that attach the bezel

to the dash. Retain the screws for

reinstallation.

5.

cut out the supplied template (see

Figure 39) and align the template

onto the front of the cluster bezel

by placing its left edge against the

cluster rib, and its bottom edge

against the cluster bottom edge. Use

masking tape to securely hold down

the template. NOTE: Do not tape over

the markings on the template.

6.

Using a

3

8

” Uni-bit, center the

bit onto the

3

8

” drill location on the

template and slowly drill through the

IP. Using a

1

8

” drill bit, center and

drill through the

1

8

” location on the

template. Remove and discard the

template and any plastic shavings.

NOTE: It is important that the hole is

drilled at the recommended location.

The switch may not clear the

instrument panel structure if the hole

is shifted to another location.

7.

Align the label onto the previously

drilled hole. Make sure the entire

mounting surface is clean and free of

dirt and oil before mounting the label.

clean and dry as required using a

cloth dampened with rubbing alcohol

or similar cleaning solution.
CAuTIoN: Do not spray fluid

directly onto any electrical

equipment, or equipment damage

may result. Mount the EconoMind

Diesel Tuner switch label onto

the cluster bezel by peeling the

protective backing off the adhesive

tape on the back of the switch

label. Hold the label against the

panel for approximately 20 seconds

while applying pressure to allow the

adhesive to properly adhere to the

surface.

Section 7

PoWER SElECToR SWITCH INSTAllATIoN

Figure 39 — Template

Figure 38

96812 v.7.0

29

Advertising