1.

From the engine compartment,

locate the rubber grommet high

on the driver’s side of the vehicle

firewall. The grommet is about 3”

in diameter. Make a 1” x 1” cross-

shaped incision in the grommet (see

Figure 5.1).

2.

From the engine compartment,

feed the grey three-connector cable

through the incision made in the

firewall grommet and into the cab.

From inside the cab, remove the

lower dash panel under the steering

column to allow access to these

three connectors.

3.

Locate the two black wire harness

locking connectors between the

brake fluid reservoir and the air

conditioning compressor. Lift the gray

connector locks and disconnect the

38-pin connector pair and the 24-pin

connector pair (see Figure 5.2).

4.

Insert the male 38-pin connector

on the EconoMind harness into the

female 38- pin connector on the

factory harness. Insert the female

38-pin connector on the EconoMind

harness onto the male 38-pin

connector of the factory harness.

Repeat this process with the 24-pin

connectors (see Figure 5.2).

5.

Go to the air box and remove the

stock Mass Air Flow (MAF) connector

located on the Banks Intake tube

6.

Locate the MAF connector from

the EconoMind harness and route

as shown in Figure 5.3. Follow the

factory harness located on top of the

engine that runs in front of the intake

manifold and behind the alternator.

Feed the connector under the

compressor outlet and under where

the air intake hose normally rest.

7.

Connect the EconoMind (female)

MAF connector to the factory (male)

MAF sensor and connect the factory

(female) MAF connector to the

EconoMind (male) MAF connector.

8.

Connect the thermocouple

leadwire to the EconoMind harness

with the supplied nuts and bolts.

Cover this joint with the supplied

heat shrink tubing and heat until the

tubing conforms to the joint. Make

sure the entire joint is insulated.

Section 5