Banks Power Chevy_GMC Trucks: Duramax LLY-LBZ (Diesel ’06 - 07 6.6L) Power Systems- PowerPack & Stinger Systems w EconoMind (LLY & LBZ) '06-07 (iQ) Compatible with Optional Banks iQ User Manual

Page 29

Advertising
background image

96816 v.3.0

29

Section 6 not needed if installing

the Power Level Selector Switch. If

this is the case, please proceed to

Section 7.

WaRNING: Below 32

o

F (0

o

C) or

above 140

o

F (60

o

C), the Banks iQ

may be susceptible to damage

as a result of extended direct

exposure to sunlight, heat,

or extreme cold. It is highly

recommended that the Banks iQ

be removed from its mounting

location if the vehicle will be

subjected to these conditions

for an extended period of time.

Gale Banks Engineering is not

responsible for damage to Banks

iQ resulting from exposure

conditions.

CauTION: Do not use force

when working on plastic parts.

Permanent damage to the part

might result.

1.

Locate the Window Mount

Assembly in your kit.

2.

Assemble the Banks iQ docking

station to the Universal mount by

inserting and sliding the Universal

mount tab into the docking station

groove. Hand tighten the nut behind

the docking station to hold the

docking station in place.

3.

Attach the window mount to your

Banks iQ. See Figure 6.1. Align and

place the two (2) lower tabs on the

window mount to the corresponding

slots on the bottom of Banks iQ first

then snap the top of Banks iQ into

place.
NOte: there may be a snug fit when

installing the Banks iQ into the window

mount. take care not to force this

process.

4.

Find a suitable place on the

windshield for ease of access and

viewing of Banks iQ. Use location

shown in Figure 6.2 as a reference

for mounting Banks iQ in your

vehicle. Loosen the knob and move

the swivel suction plate to achieve

desired viewing angle of the Banks

iQ screen. Do a test fit and note

the angle necessary to achieve the

correct viewing angle.

5.

Make sure the suction cup and

the mounting area on the windshield

are clean and dry. With the suction

lever in the up position, ensure

the suction cup is flat against the

windshield, and then push the

suction lever down to secure in

place.

6.

Next, remove and set the fuse

access panel aside. See Figure 6.2.

7.

Locate the Banks OBD II Interface

Cable in your kit. This cable has

three connection points. Connect

the RED OBD II connector on the

Banks interface cable to the vehicle

OBD II connector. Use a cable tie as

shown in Figure 6.3 to secure the

Banks interface cable to the vehicle

OBD II connector. Next, connect the

6-pin connector on the Banks OBD II

interface cable to the 6-pin connector

on the EconoMind Tuner harness.

Section 6

MOuNTING aND CONNECTING THE BaNkS iQ

Figure 6.1 Attaching Banks iQ to window mount

Figure 6.2 Mounting location for Banks iQ, Chevy LMM Shown.

Advertising