Banks Power Chevy_GMC Trucks: Duramax LLY-LBZ (Diesel ’06 - 07 6.6L) Power Systems- PowerPack & Stinger Systems w EconoMind (LLY & LBZ) '06-07 (iQ) Compatible with Optional Banks iQ User Manual

Page 9

Advertising
background image

96816 v.3.0

9

NOte: If a combination hanger/clamp

is utilized, evenly torque nuts to 35

ft-lb. the clamps only need to be

tight enough to form a seal and hold

the pipes together. Over tightening

the clamps may cause the system to

leak due to the pipe being crimped.

torque the four (4) factory flange

nuts, previously removed, to 30

ft-lbs.

16.

Install exhaust tip by sliding

it over the outlet of the tailpipe.

The tip should be positioned so

that the outlet of the exhaust tip

is approximately one (1) inch past

the outlet of the tailpipe or where

aesthetically pleasing.
NOte: On vehicles with dual rear

wheels, the outlet of the tip should

be placed approximately 3.5 inches

past the outlet of the tailpipe.
Torque the band clamp to 35 ft-lbs.

Skip to Step 36 to complete Banks

Monster Exhaust System.
BaNkS SPLIT-DuaL MONSTER

ExHauST SYSTEM (Step 24 thru

35)

17.

Install a 4”saddle clamp onto

the Monster muffler inlet. Install

the Monster muffler inlet onto the

Banks intermediate pipe outlet.

Be sure that the inlet side of the

muffler (see markings on muffler

body) is facing toward the front of

the vehicle. Orient the muffler such

that the “Banks Monster” logo is

facing towards the frame and is

level with the ground. Verify that the

muffler and intermediate pipe are

completely engaged.

18.

Install the muffler hanger clamp

onto the muffler outlet. Insert the

hanger pin into the vehicle’s rubber

insulator.

19.

Install the Banks Y-pipe into the

muffler outlet such that the outlets

are pointing up. Install a 3-

1

2

” saddle

clamp onto each Y-pipe outlet (See

Figure 1.4).

20.

Install the driver-side hanger

bracket into the rear of the driver-

side frame rail. If a hitch is installed,

remove the hitch hardware on the

driver-side, install the frame bracket

and reinstall the existing hitch

hardware.
For Long bed models, use one (1)

bolt on the flat of frame rail and one

(1) bolt on the side of the frame rail.
For Short bed models, use two (2)

bolts on the flat of the frame rail (no

bolts on the side). See Figure 1.5.

21.

Install the supplied rubber

insulator onto the Banks hanger

bracket.

22.

Install the driver-side tailpipe

(longer) into the top Y-pipe outlet.

Install the driver-side tailpipe hanger

into the Banks rubber insulator.

Figure 1.3

Figure 1.4

Advertising