Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Power Systems- Stinger system '03-04 User Manual

Page 15

Advertising
background image

53.

Inside the cab, plug the main 8-

and 10-pin connectors from the wire
loom into the OttoMind box.

54.

On vehicles with automatic

transmissions, plug the TCC wire
harness into the OttoMind box.

55.

In the engine compartment,

unbolt the nut from the ground
terminal on the drivers side battery.
Locate the ring terminal on OttoMind
wire harness. Install this ring terminal
onto the battery ground and re-install
the nut. See Figure

20

.

56.

FOR ALL 2003 VEHICLES

ONLY: Reinstall the large black
electrical connector (c130) that was
removed in Step

1

.

Note: Go over the entire installation
as a precautionary check to ensure
that all clamps are tight, wiring
and hoses are properly routed, and
connections are correct and tight.
Make sure that the wire harness is
not lying in the way of the brake and
accelerator pedals.

Figure 18B

19

9 6 7 6 7 v . 3 . 0

| 15

Advertising