3. Installation

10

PNEG-1755 PLC WatchDog

Install Procedure

This installation takes place in the power panel of the tower dryer system. Follow the steps listed below to
install the components; also refer to

Figure 3A on Page 9

.

1. Turn OFF power to the dryer and control panel.

2. Attach the Red Lion controller and the 24 VDC power supply to the DIN rail.

3. Wire the 120 VAC supply power from the power panel terminal “L1.1”, to the 24 VDC power supply

terminal “L”.

4. Wire the white NEUTRAL wire from the power panel terminal “L2”, to the 24 VDC power supply

terminal “N”.

5. Wire the GROUND from the power panel terminal strip, to the 24 VDC power supply terminal “

”.

6. Wire the 24 VDC power supply terminal “+”, to the Red Lion terminal “+24”.

7. Wire the 24 VDC power supply terminal “-”, to the Red Lion terminal “COMM”.

8. If a cellular modem is being installed, first refer to

Appendix A on Page 31

for additional instructions

and then return here.

9. Plug the RJ12 end of the Pacific Cable #CBLAB001 into the RS232 port of the Red Lion controller

and the DB9 end into the SLC serial port.

10. Plug the Ethernet cable with a live internet connection into the ETHERNET port on the Red

Lion controller.

NOTE: Use cable ties to secure wires.

11. Turn ON power to the dryer and the power panel. A green LED should illuminate on the 24 VDC

power supply indicating power.

12. A green LED, labeled “STS”, should illuminate on the Red Lion unit indicating the controller is

operating properly.

13. A red LED, labeled “CF”, should illuminate verifying a valid CompactFlash card is installed.

Network Setup

This section is intended to help ISP or network technicians install the PLC WatchDog. If this section does
not make sense to you, it is strongly advised to request the service of a network technician.

SECURITY NOTE: Ultimately, it is the End User’s responsibility to make sure the PLC WatchDog is

properly placed behind a secured network security system.

Configuring a Modem/Router

If the PLC WatchDog is connected to a modem/router that is configurable, listed below are a few
recommendations to assist with setup. The methods below do not cover every configuration that
is available.

DHCP Reservations

This is the preferred method for installation. A reservation can be an option in the configuration of a
modem/router. It can be set to serve a given MAC address with a certain IP address when it is introduced
to the network. As mentioned above, the MAC address of the PLC WatchDog can be found on a label on
the front of the Red Lion controller.

Once the IP address has been setup for the MAC address, forward incoming requests on ports 21 and 80.