Sidewall assembly – Grain Systems Tanks PNEG-256 User Manual
Page 22
Advertising
![background image](/manuals/277597/22/background.png)
22
PNEG-256 6', 7' & 9' Bulk Feed Tanks
6. SIDEWALL ASSEMBLY
Caulking
Figure 6A Caulking Detail
Note: The rope caulking is installed before each sheet is assembled. Wipe sheet clean
where it is to be applied. Apply caulking on each side of the holes on the vertical
seams and also on each side of the horizontal row of holes.
Figure 6B
Caulking is to be
applied to all BFT
parts before
assembly.
Advertising