R easier sidewall assembly, See figure 6d), Sidewall assembly – Grain Systems Tanks PNEG-256 User Manual
Page 24
Advertising
24
PNEG-256 6', 7' & 9' Bulk Feed Tanks
6. SIDEWALL ASSEMBLY
Figure 6D Ring Overlap Detail
Figure 6E
Important: BOLTING PATTERN BEGINS IN THE CENTER OF THE SHEET! When starting
to assemble the sidewall rings to one another, be sure to start in the center of
the sheet and work to the outside edges (horizontal seams). This allows the
sidewall to draw up evenly.
5/16'' Nut
Caulking
Lower
Upper Ring
5/16'' x 3/4''
Tighten bolts from the
nut side only.
First Ring Assembly
Advertising