Control arm detail, Rol arm detail, See figure 7t – Grain Systems Tanks PNEG-256 User Manual
Page 34: Warning, Roof
![background image](/manuals/277597/34/background.png)
34
PNEG-256 6', 7' & 9' Bulk Feed Tanks
7. ROOF
Bolt the Chain Holder (BLK-11949) to the bottom horizontal row of sidewall holes, or field drill
and bolt to the leg tie brace
. Two (2) 4'' plastic handles and extra key ring clips
are provided for use at the hopper eave to be used as fully open and fully closed cap indicators.
Figure 7S
The control arm is spring loaded. It must be released while on the ground and before
attaching it to the peak ring. Failure to do so will result in serious injury.
Note: Use the chart on
for Control Arm and Ground Control details.
Figure 7T Control Arm Detail
Make sure the loop of the Main Cap Spring
(BLK-11623) is held securely in the preloaded
position by the head of the 5/16'' bolt beneath.
If necessary, place one or more 5/16'' flat
Washers under the bolt head to ensure
that the bolt catches the loop.
WARNING
Right Hinge
Attachment Holes
Left Hinge
Attachment Holes
Spring Stop Attachment Hole