Grain Systems Unload Augers PNEG-1555 User Manual
Page 13
Advertising
![background image](/manuals/277609/13/background.png)
4. Installation
PNEG-1555 8" Commercial Vertical Drive Unit - Dual Drive
13
E. Remove the motor mount assembly.
F. Unbolt the four (4) 1/2'' x 1'' hex bolts, lock washers, and hex nuts, and remove the existing belt
guard brackets and motor mount sides.
Figure 4B
G. Loosen and remove the lock collar on the 1-1/4'' four (4) hole flange bearing.
Figure 4C
Advertising