Start-up, Chapter 6 start-up, Perform pre-start checks – Grain Systems Unload Augers PNEG-1555 User Manual

Page 27

Advertising
background image

PNEG-1555 8" Commercial Vertical Drive Unit - Dual Drive 27

6. Start-Up

Perform Pre-Start Checks

1. Make sure ALL belts are tensioned properly.

2. Make sure ALL shields are in place and that the belt(s) and pulley(s) are able to move freely.

3. Inspect the drive unit for any problems or potential problems.

4. Be aware of any emergency shut down procedures. Two (2) people must always be in a position

where the operation of the equipment can be monitored.

5. Before starting the auger for the first time, make sure that all parts are assembled correctly

according to the instructions in this manual.

6. The bin well inside the bin should have a control gate. The gate should be closed before start-up.

Failure to perform any or all of these pre-start checks may cause damage to the
equipment and/or cause SERIOUS INJURY or DEATH to those in the work area.

Failure to perform any or all of these pre-start checks may also be a misuse of the
equipment. Any misuse of the equipment may void the warranty.

ALWAYS keep ALL guards and shields in place until all the power is
disconnected and locked out.

Make certain ONLY trained operators are in the work area before operating or
moving the machine. Two (2) people must always be in a position where the
operation of the equipment can be monitored.

Advertising