Shut down, Chapter 7 shut down, Normal shut down – Grain Systems Unload Augers PNEG-1555 User Manual

Page 29: Emergency shut down, Lock out, Storage preparation

Advertising
background image

PNEG-1555 8" Commercial Vertical Drive Unit - Dual Drive

29

7. Shut Down

Normal Shut Down

1. Before shutting down the unit, make certain that bin well and unloading tubes are empty.

2. Disconnect and lock out the power source before leaving the work area.

Emergency Shut Down

1. Know how to shut down the auger in case of an emergency.

2. Disconnect and lock out the power source.

3. Do not restart the auger under load.

4. Close the bin well control gates.

5. Clear out as much grain from the auger and hopper as possible.

6. Unlock and reconnect the power source.

7. Gradually clear the auger until there is no grain or obstruction.

Lock Out

1. Always stop and disconnect the power source whenever the operator must leave the work area or

for maintenance of the machinery.

2. Make sure no one can operate the unload auger while the operator is not in the work area.

Storage Preparation

1. Close all wells to discharge auger.

2. Be sure the unload tube is empty.

3. Shut down the auger.

4. Make sure power source is locked out and disconnected.

5. Make sure all fasteners are tight.

Never restart when under a full load. Starting unit under load may result in
damage to the machine. Such damage is considered abuse of the equipment.

Use the type of main power disconnect switch that is capable of being locked
only in the OFF position.

Advertising