Start-up procedure, Chapter 13 start-up procedure, Initial dryer start-up – Grain Systems PNEG-1820 User Manual

Page 32

Advertising
background image

32

PNEG-1820 CE Compliant Top Dry Series 2000 Autoflow

13. Start-Up Procedure

Initial Dryer Start-Up

1. With Control Power switch OFF, turn ON the main power supply.

2. Pull out all Emergency Stop switches.

3. Set the switches as follows:

Moisture Control switch - “ON”

Aeration Fan switch - “AUTO”

Load Auger switch - “OFF”

Fan switch - “AUTO”

Heater switch - “AUTO”

Dump switch - “AUTO”

Dry and Hold switch - “OFF”

4. Make sure there is wet grain in the wet supply tank.

5. Turn control power “ON” position.

6. The screen will display a copyright message and software version number.

7. The screen should read “STOPPED”. The chamber high level and the chamber low level should both

read “NO”.

8. Set the dry timer using the drying charts for the specific bin size, fan and heater size, drying

temperature and grain input moisture content.

9. Set the dump timer as follows:

18' Diameter bin = 30 Seconds

21' Diameter bin = 33 Seconds

24' Diameter bin = 36 Seconds

27' Diameter bin = 39 Seconds

30' Diameter bin = 42 Seconds

36' Diameter bin = 36 Seconds

10. Set all other delays and timers as prescribed in the electronic monitoring control section

on Page 16

of this manual.

11. Press the Reset button for timer changes to take effect immediately.

Advertising