Place control panel into docking station – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1366 User Manual

Page 24

Advertising
background image

5. Assembly

24

PNEG-1366 12" and 16" Series II Sweep Quick Disconnect Control Box Kit

Place Control Panel Into Docking Station

Attach the control box to the docking station by sliding the tongue into the pocket on the docking station.

(See Figure 5H.)

Figure 5H

Do not lift equipment without personal or mechanical assistance. Single person lift
could cause injury.

To avoid muscle strain or back injury, use lifting aids and proper lifting techniques
when removing or replacing the control box.

Advertising