Start-up, Chapter 6 start-up, Perform pre-start checks – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1366 User Manual

Page 32

Advertising
background image

32

PNEG-1366 12" and 16" Series II Sweep Quick Disconnect Control Box Kit

6. Start-Up

Perform Pre-Start Checks

1. Make sure ALL shields are in place.

2. Inspect the drive unit for any problems or potential problems.

3. Be aware of any emergency shut down procedures. Two (2) people must always be in position to

monitor the operation of the equipment from outside the bin.

4. Before starting the auger for the first time, make sure that all parts are assembled correctly according

to the instructions in this manual.

To ensure that the drive is not unexpectedly started, turn OFF and lock out the
power source before proceeding. Failure to observe these precautions could
result in bodily injury.

Failure to perform any or all of these pre-start checks may cause damage to the
equipment and/or cause SERIOUS INJURY or DEATH to those in the work area.

Failure to perform any or all of these pre-start checks may also be a misuse of
the equipment. Any misuse of the equipment may void the warranty.

ALWAYS keep ALL guards and shields in place, until all the power is
disconnected and locked out.

Be sure to remove the grain from the drive chain and sprockets. If this is not
done, damage can occur to the drive system.

Make certain ONLY trained operators are in the work area before operating or
moving the machine. Two (2) people must always be in position to monitor the
operation of the equipment from outside the bin.

Advertising