Securing the dryer wet bin sides, Chapter 6: installing the wet bin – Grain Systems PNEG-1891 User Manual

Page 34

Advertising
background image

Chapter 6: Installing the Wet Bin

Figure 6-2 Turnbuckle location for dryers twelve ft (2.66 m) and longer

B

Lift kit turnbuckles for twelve ft (2.66 m) and longer dryers

2. Bolt the top angle brackets (D) to the angle brackets already installed, positioning the brackets back-

to-back. Brackets are located on the front and rear of the dryer, (see

Figure 6-3, page 34

).

3. Bolt the load auger housing channel (C) to the front and rear of the ends of the dryer wet bin.

Figure 6-3 Angle brackets and housing channels

C

Top auger housing channel

D

Top angle bracket

4. Once the auger assembly is securely bolted, unbolt the lift kit legs and lower them back into their

shipping position.

Securing the Dryer Wet Bin Sides

After having raised the load auger, you must install the side panels so that the dryer wet bin can receive
and hold the incoming grain.

34

Pneg-1891 Portable Dryers

Advertising